Engineering Department
Wastewater Collection System Master Plan Volume A - Mar. 2006
Wastewater Collection System Inflow & Infiltration Addendum Study - Jun. 2006
Facilities Plan for Wastewater Treatment Plant No. 1 Draft - May 2008
Facilities Plan for Wastewater Treatment Plant No. 2 - Oct. 2007
Wastewater Treatment Plant No. 1 Environmental Assessment - Aug. 2005
Wastewater Treatment Plant No. 2 Environmental Assessment - Feb. 2005
Stormwater Master Plan Volume A - Mar. 2006
Appendix A Appendix B Appendix C Appendix D
Stormwater Master Plan (Limited Area) - Sep. 2004
Flood Insurance Reimbursement for Loss Avoidance Measures
Letter to Industry for Development within Special Flood Hazard Areas
www.fema.gov/hazard/flood/index
Vertical Datum Information
Jennifer Wirsing
Engineering Services Coordinator
jwirsing@coosbay.org
Jessica Spann Engineering Technician
jspann@coosbay.org
Kevin Neff GIS Specialist
kneff@coosbay.org
Read the News